Design-Build Services

We offer a streamlined design-build approach, where our in-house team or trusted partners collaborate with you to develop plans that seamlessly integrate design and construction, saving you time and resources.

Design-build is a construction delivery method where a single entity takes responsibility for both the design and construction of a project. This contrasts with the traditional design-bid-build method, which involves separate contracts for design and construction.

Key Steps in the Design-Build Process

  1. Team Selection:

    • The owner selects a design-build team, which typically includes an architect, contractor, and engineers.
    • This team can be a single entity or a joint venture.
  2. Project Planning:

    • The design-build team works closely with the owner to define project scope, goals, and budget.
    • A comprehensive project plan is developed, including timelines and resource allocation.
  3. Design:

    • The design team creates architectural and engineering plans, considering constructability and cost-efficiency from the outset.
    • There is often a collaborative effort between designers and contractors to optimize the design.
  4. Guaranteed Maximum Price (GMP) or Bid:

    • The design-build team provides a guaranteed maximum price for the project.
    • Alternatively, they can compete for the project through a bidding process.
  5. Construction:

    • The construction phase begins, with the design-build team responsible for all aspects of the project.
    • There is often a streamlined process due to the integrated design and construction team.
  6. Project Closeout:

    • Final inspections are conducted, and project documentation is completed.
    • The project is handed over to the owner.

Advantages of Design-Build

  • Single Point of Contact: The owner deals with a single entity for both design and construction.
  • Faster Delivery: Overlapping design and construction phases can accelerate project timelines.
  • Cost Control: The guaranteed maximum price provides budget certainty.
  • Improved Communication: Collaborative teamwork enhances communication and problem-solving.
  • Risk Reduction: The design-build team shares responsibility for project success.

In essence, design-build promotes efficiency, collaboration, and risk management, often leading to projects that are completed on time and within budget.